Esh Construction has been appointed to deliver an extensive drainage infrastructure package at Sheepfolds, supporting the next phase of development within the Riverside Sunderland regeneration programme.
Following the successful delivery of several key packages on behalf of Sunderland City Council, Esh has been selected to construct the foul and storm water drainage infrastructure required to support future development at Sheepfolds.
Works include the installation of 462 metres of surface water sewer and 286 metres of foul sewer, alongside 19 manholes, an attenuation tank, an outfall and connections into the existing drainage network for future phases of the regeneration programme.
Enabling works are already underway, with main construction scheduled to commence later this month and due for completion in late 2027.
Steven Garrigan, Divisional Director at Esh Construction, commented: "We are delighted to have been appointed to deliver this important infrastructure package at Sheepfolds and to continue our involvement in the wider Riverside Sunderland regeneration programme.
"Having successfully delivered previous works within the area, this appointment reflects the strength of our relationship with Sunderland City Council and our ability to deliver complex civil engineering projects in challenging environments.
"As Sheepfolds continues to evolve, these works will play an important role in preparing the site for its next phase, ensuring future development can progress and the transformation of this prominent riverside location can continue."
The contract includes deep drainage installations at depths of approximately seven metres below ground level, alongside the installation of a precast concrete attenuation tank adjacent to the River Wear. Delivered using a combination of traditional open-cut trenching and pipeline auguring techniques, the scheme will draw on Esh's specialist civil engineering expertise to overcome complex ground conditions and logistical challenges across the site.
Cllr James Jackson, portfolio holder for business, housing and regeneration at Sunderland City Council, added: “Increasing the number of people living and working in the city centre is at the heart of our Riverside Sunderland masterplan, so it is fantastic to see work progressing on this latest package of infrastructure improvements.
“Once complete, the Sheepfolds neighbourhood at Riverside Sunderland will see around 450 high-quality homes rise from the ground, providing a major boost to local businesses while ensuring the city centre is a vibrant and attractive place to live, work and play.”
The latest appointment builds on Esh's successful track record at Sheepfolds, with the company continuing to play a key role in the site's transformation. By delivering the critical drainage works needed to support future development, Esh will help create the foundations for future growth as the wider Riverside Sunderland vision continues to take shape.