Stainton Grove HWRC
£1.6m
Stainton Grove HWRC - £1.6m
The scheme comprised the redevelopment of a former council hub facility into a Household Waste Recycling Centre.
Works included; hard standing and roadway, a raised ramp, skip storage areas, car parking facilities, pedestrian walkways, sorting/reuse buildings, welfare and weighbridge offices.
PDRC Warehouse Extension and Trailer Park
£1.6m
PDRC Warehouse Extension and Trailer Park - £1.6m
Groundworks were undertaken to accommodate an extension to an existing warehouse, new loading docks and yard.
Works comprised the installation of a concrete floor slab, creation of crib-lock retaining wall, installation of drainage separators, muck shift, surfacing, paving and palisade fencing.
Kirkstall Waste Facility
£4.1m
Kirkstall Waste Facility - £4.1m
An existing waste recycling centre was refurbished over two phases.
Works included the demolition of the existing waste store and the subsequent new build of a modern waste recycling facility and on-site resale store.
Ellington In Vessel Composting
£6.1m
Ellington In Vessel Composting - £6.1m
This scheme comprised the refurbishment of an existing waste recycling centre.
The works included the demolition of the existing waste store and the subsequent new build of a modern waste recycling facility and onsite second-hand resale store.