Our Schemes

Filter By:

Clear Filters

Showing Results For:

Civil Engineering
Industrial & Distribution
mailto

Redcar Gatehouse

£1.3m

Redcar Gatehouse - £1.3m

Delivered by Esh’s civil engineering division, the scheme based at the entrance of the former Redcar steelworks has delivered a grand state-of-the-art entrance for a new and long-anticipated internationally distinctive industrial zone in the Tees Valley.

Demolition of the existing gatehouse paved the way for a new modern gatehouse building constructed with structural insulated panels. Car parking areas were formed to the east and west of the entrance – with the use of gabion retaining structures to retain the existing embankments – while hard landscaped footpaths and pedestrian islands were constructed to form a link between the parking facilities and gatehouse.

A key focal point of the development is a purpose-built 3.7-metre-high LED screen which was installed onto the existing bridge as a feature to showcase the capabilities of the industrial zone. Final decoration was provided with bespoke street lighting, modern landscaping, and planting of mature trees to create a welcoming, eye-catching entrance for visitors and international investors.

Stainton Grove HWRC

£1.6m

Stainton Grove HWRC - £1.6m

The scheme comprised the redevelopment of a former council hub facility into a Household Waste Recycling Centre.

Works included; hard standing and roadway, a raised ramp, skip storage areas, car parking facilities, pedestrian walkways, sorting/reuse buildings, welfare and weighbridge offices.

PDRC Warehouse Extension and Trailer Park

£1.6m

PDRC Warehouse Extension and Trailer Park - £1.6m

Groundworks were undertaken to accommodate an extension to an existing warehouse, new loading docks and yard.

Works comprised the installation of a concrete floor slab, creation of crib-lock retaining wall, installation of drainage separators, muck shift, surfacing, paving and palisade fencing.

Kirkstall Waste Facility

£4.1m

Kirkstall Waste Facility - £4.1m

An existing waste recycling centre was refurbished over two phases.

Works included the demolition of the existing waste store and the subsequent new build of a modern waste recycling facility and on-site resale store.

East Shore Enabling Works

£704k

East Shore Enabling Works - £704k

The East Shore development site located at Port of Sunderland was granted Enterprise Zone status in 2017, as a result, works were required to enhance connectivity and provide added incentive to investors looking to establish a long-term operation at the Port.

Esh’s civil engineering division delivered initial groundworks and remediation of the as well as the installation of a surface water drainage system.

Ellington In Vessel Composting

£6.1m

Ellington In Vessel Composting - £6.1m

This scheme comprised the refurbishment of an existing waste recycling centre.

The works included the demolition of the existing waste store and the subsequent new build of a modern waste recycling facility and onsite second-hand resale store.

Contact our Business Development Team

Please get in touch with our business development team, we are keen to hear about all potential business development opportunities.